33.2 Maintenance Schedule for Transmission Lines
Maintenance or Test
Recommended Interval
Reference
Review equipment ratings
5 years
NERC Planning Standard
Visual inspection with
binoculars
Semi-annually
NFPA 70B Appendix H
Infrared scan
Annually
NFPA 70B, 18-17
34. BLACKSTART GENERATORS
34.1 General
Upon complete loss of the power system (blackout), it will be necessary to establish
initial generation and begin system restoration at select powerplants. Initiating (main
unit) generators are referred to as system blackstart generators and are designated as
such in system blackstart restoration plans. They must be able to self-start without
any source of off-site electrical power and maintain adequate voltage and frequency
while energizing isolated transmission facilities and auxiliary loads of other
generators.
34.2 Maintenance Schedule for Blackstart Generators
Maintenance or Test
Recommended Interval
Reference
Review equipment ratings
5 years
NERC Planning Standard
Demonstrate through
simulation or test that the unit
can perform its intended
function as required by the
system restoration plan.
5 years
NERC Planning Standard
Each unit tested to verify it
can start and operate without
being connected to the
system.
Interval not yet established by
NERC
NERC Planning Standard