EZ Maintenance CMMS Software Img



background image
APPENDIX A. - Continued
Page 3
Personnel
Two tours were given to school groups at Morrow Point. The Facility
Maintenance Assistant received NOS training in Durango during the month. She
also spent March 31 in Grand Junction on payroll matters.
FLAMING GORGE FIELD DIVISION
Administration
In Warehouse #1, housing items were inventoried, 32 items were added to the
Stores system, and two more sets of pallet racking were added. Barbara
Wallin from the Regional Office assisted the supply clerk in listing 76
items as excess. GSA sale of pick-up 1-113802 was completed. Supply trips
will be made to Vernal on Wednesdays for requisitions received by Monday and
items can be picked up at the warehouse. Recruiting for electrician,
temporary, and summer positions is in progress. A promotion board to pick
candidates to be referred for the Maintenanceman position at Fontenelle was
held. The vendor installation of carpets and blinds is proceeding on an as-
needed basis. A rural route mail box has been installed for the receipt of
incomming mail by 10:30 a.m. Flaming Gorge now has the responsibility of
calculating the bill to the Forest Service and the Central Finance Office
has the responsibility of transferring it electronically. A bill was
submitted for $76,000.
Operations
The lake elevation at 12 p.m., March 31, 1988 was 6021.20 feet. The
corresponding storage content of 3,020,000 acre-feet is 81% of capacity. The
elevation increased 0.12 feet with a corresponding storage change of 5,000
acre-feet. The inflow for the month was 85,150 acre-feet. Total discharge
was 80,150 acre-feet, all of which was used for generation. Total generation
was 28,594,000 E'~H, 15,166,000 KWH less than the previous month.
There were twenty clearances placed and issued this month. All three units
were unavailable for one week this month for scheduled maintenance and
replacement of the grounding transformers and surge capacitors. There was
one unscheduled outage this month on Unit #2 due to a failure of the
generator breaker to close. It was found that the operating spring had
failed to recharge. This was corrected.
Maintenance
All PM work was completed. The gate indicators for the SCADA-RTU were
adjusted and the grounding transformers and surge capacitors were replaced
on all three units. The Permanent Magnet Generator (PMG) on Unit #1 was
overhauled including all bearings and insulation bushings. Scaffold brackets
were installed in the draft Cubes, the governors were checked out, the twin
strainers cleaned, and the plug valves greased on all three units and a
surface of about 20 square inches on Unit #3 turbine runner was arc aired
and rewelded. Louvers were installed in the access doors on the face
(FIST 1-3 12/89)
84
CMMS Fleet Maintenance Software for Fleet, Vehicle, & Equipment Maintenance

This Information is Reprinted From UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION