II. O&M Improvement Reporting System
distributed within 30 days after completion of the confidential report. It must be concise and complete to
provide for meaningful study and discussion of the Incident. One copy of the report shall be provided the
Project Operation Services, Code D-5140, Denver Office; and one copy shall be forwarded to the Chief,
Facilities Engineering Branch, Code D-5210, Denver Office.
Detailed instructions for reporting on Items, as they appear in sequence on the form, are as follows:
Sequence
Item Description
(1)
Region
Region in which the incident occurred.
(2)
Report No.
Regional report number.
(3)
Date
Date of incident.
(4)
Time
Time of incident.
(5)
Type of Report
Indicate with an "X" the type of report
(6)
Function Being
Indicate with an "X" the function being performed
Performed
at the time of the incident. This Is not necessarily
the employees job classification.
(7)
Result of Incident
Indicate with an "X" the appropriate item or items
defining the result of the Incident.
(8)
Cause of Incident
Indicate with an "X" the appropriate item or items
or condition
defining the cause of the incident or condition.
(9)
Narrative Description
A narrative summarization of the incident including:
of Incident or
(a) Events leading up to the incident, with remarks on
Condition
time available to accomplish required procedure,
stress, disturbing or distracting factors, etc.
(b) Consequences, such as injuries, damage, service
impairment, etc.
(c) Restoration of service.
(10) Consequences
Narrative explanation of the cause(s) of the incident
65
(FIST 1-3 12/89)