III. Annual Summary of Substation Outages
Figure 13
is an example of a partially completed PO&M Report 130. This report provides an annual summary
of the total number, duration, major causes and effects of outages in each major substation and switchyard.
The report will be prepared in the Denver Office, using ADP procedures, including retrieval of information
previously transcribed from monthly forms PO&M-62.
Copies shall be furnished the Commissioner, Washington Office, and each regional office for distribution as
stipulated by the Regional Director. The report shall be completed and available for distribution by the end
of January following the reported year.
For purposes of this report, an "outage" of a substation or switchyard will be considered to have occurred
whenever a complete station, or any complete bus section within a station, becomes entirely deenergized,
even momentarily.
Following is a brief description of the various items of information provided by this report:
Item Description
(1)
Calendar Year
The calendar year which the report covers. (There
may be occasions where use of this same basic format
may be desired for summarizing substation outage
information for some period other than a calendar
year, in which event changes could be made as
required in the report title, summary period, etc.)
(2)
Region
The geographical regions, in which the stations are
located.
(3)
Project
The projects of which the station is located, arranged
alphabetically within regions, using the approved
project codings listed in
FIST Volume 4-2
, "Power
O&M Codes for ADP."
(4)
Station:
(4a)
Name
An alphabetical listing of only those major sub-
stations and switchyards on each project which
experienced an outage during the reported period.
(4b)
Bus Voltage and
The voltage, in kV, of each station or bus reported.
Section
In the event there are several buses of different voltages
in a station, or separate sections of a single-voltage
bus each of which can be individually isolated, entries
on separate lines of the report will summarize outage
data for each reported bus section.
If buses of different voltages in a single station experienced
outages, they will be listed in descending numerical order.